Be the first to review “Cleaning Safe Work Method Statements” Cancel reply
Cleaning Safe Work Method Statements
$297.00
Need some SWMS to implement into your cleaning business or use as part of your tender response?
This packaged has been designed for cleaning companies and includes a Risk Matrix and a SWMS template.
This package of 23 SWMS has been designed for the following tasks:
- SWMS – Bath and Shower Cleaning
- SWMS – Blood and Bodily Fluid Spills
- SWMS – Buffing Floors
- SWMS – Carpet Spotting-Cleaning
- SWMS – Cleaning at Construction Sites
- SWMS – Cleaning of Air Conditioning Vents
- SWMS – Cleaning of Stairs, Ramps and Passageways
- SWMS – Cleaning Office and Other Furniture
- SWMS – Detailing, Mopping and Sweeping
- SWMS – Dust Cleaning
- SWMS – Lift Elevator Cleaning
- SWMS – Moving Furniture, Tables, Chairs and Other
- SWMS – Needlestick Handling
- SWMS – Rubbish Collection General
- SWMS – Safe Use of Chemicals
- SWMS – Scrubbing Floors
- SWMS – Scrubbing Tiles
- SWMS – Storeroom Housekeeping
- SWMS – Sweeping and Hosing Outside Areas
- SWMS – Toilet and Washroom Cleaning
- SWMS – Travelator and Escalator Cleaning
- SWMS – Vacuuming
- SWMS – Wall and Ceiling Washing
Reviews
There are no reviews yet.